Production process of the Kaplan`s turbine with horizontal shaft of rotor diameter d=560 mm for the SHPP Aleksandrija has begun. In addition to the turbine our company will provide the following:
- asynchronous generator
- draft tube
- electrical equipment
- automatic equipment
- butterfly valve with hydraulic steering system
The equipment will be delivered and started up in November 2012.