Production process of the axial Kaplan`s turbine of rotor diameter d=1430 mm for the SHPP Staraya Chortoriya has begun. In addition to the turbine our company will provide the following:
- Asynchronous generator power 320 kW
- Draft tube
- Hydraulic equipment
- Electric equipment
- Automation equipment including GSM and Internet modules
The equipment will be delivered in August 2013. More information You can find on page References / Reference list.